Skip to main content
Daily notes, organized for review

Bring recorded progress to your next IEP review

For Special education coordinators, case managers. Keep observations, goal data, and support records together so your team can review progress and prepare the next update.

IEP logsaved example
Aria M.
GOAL 2 · WK 6

Read 92 WCPM in a 1-minute probe, met the fluency target two sessions running.

Goal 2Fluency
illustrative example
Goal data pointsGOAL 2 · 92 WCPM
Progress notesDATED
Accommodation recordCURRENT
Communication logON RECORD
PDF progress reportPDF · DRAFT
FIG. 01 · SAVED EVIDENCE → IEP EVIDENCESAVED EVIDENCE → REVIEWED OUTPUT
Before Evident

Less time rebuilding the record before a meeting.

01

Re-typing IEP progress notes from scattered sources the night before a meeting.

02

Communication logs that live in email and disappear when staff change.

03

Accommodation records that drift out of date between annual reviews.

Why schools care

Case managers need IEP evidence that is current, readable, and still available when staff change. Evident links daily logs to IEP goals, keeps family and team communication on the same record, and exports a clean PDF when the meeting comes up.

Privacy & compliance

A record your team can review with confidence.

Role-based access, parent visibility controls, audit logging, and signed DPAs, so sensitive student-support work stays protected and easy to review.

Role-based access
Staff see only what their role allows.
Parent visibility controls
Staff choose which updates families can see.
Audit logging
Every change is dated and attributable.
Signed DPAs available
NDPA, DPA, FERPA, and state addenda.
See the sample report

A product-generated export using illustrative data.

A sample Evident IEP progress report with goal trend charts
An IEP progress report with per-goal trend charts and data points.Download the sample PDF
Common questions
Can we track all eight IEP measurement types?

Yes: binary, frequency, duration, trial-based, interval recording, rate, latency, and task analysis (a routine scored step by step), with baselines and targets per goal.

Is there a paper option while the team gets started?

Yes. The free IEP data sheets at evidentk12.com/iep-data-sheets are seven printables, including trial, frequency, duration, prompt level, interval, and ABC sheets. The trial, frequency, duration, and prompt level sheets fill in with up to three goals and print with a QR code that reopens them. No email is required.

What does the PDF report include?

Cover page with student info and IEP dates, per-goal pages with trend charts, data tables, and a teacher-reviewed progress narrative, a plain-language family summary page with optional Spanish translation, behavior incident summary, and communication log.

How are the progress narratives written?

AI drafts each goal's narrative from the recorded data only: data points with dates, trial accuracy, prompting levels, trend, and progress toward the annual target. Every number in a draft comes from the data, goals with too few data points are flagged instead of narrated, and the teacher reviews and can edit every word before it appears in the report, which notes it was AI-drafted and teacher-reviewed. Student names are replaced with a placeholder before anything reaches the AI provider, and schools can turn the feature off entirely.

Can I see a goal's progress over time?

Each goal graphs by date with its baseline, target and mastery lines, and a trend line once there are five sessions. A goal can carry a mastery rule, and Evident flags it for your review when the rule is met; it never marks a goal mastered on its own.

Who can see private case-manager notes?

Notes are private by default. Only staff with appropriate roles see them; family-visible notes require explicit publication.

What happens when a teacher leaves?

Student records, goals, logs, and evidence stay attached to the student. On a school license, an administrator can transfer responsibility to another teacher and review coverage and unfinished work before completing the handover.

Keep exploring
The charts and logs that feed this packet

The daily tools that feed this evidence

Start with a chart or daily log, then use the dated record to prepare the next update.

Open related teacher tool
Start with the next review

Walk into the next review with the record already built.

Choose the notes and goal data your team recorded, set the audience, and review the packet before sharing.

No credit card · your first PDF report or meeting packet is free.